5432162c-75a0-4954-9740-1def225dc6f4

Successful Grid-Connection of Chaowei Power’s 12.18MW Rooftop Distributed Project

On December 31, 2024, the 12.18MW rooftop distributed project of Hebei Yongxu Power Supply Co., Ltd., invested by Zhejiang Chaowei Power Co., Ltd. (“Chaowei Power”) and constructed by Zhiguang Green Energy (Jiangsu) Technology Co., Ltd. (“Zhiguang Green Energy”), achieved full-capacity grid-connection.
Located in Xinhe County, Xingtai City, Hebei Province, the project renovated old factories and utilized existing rooftop and parking lot resources. Zhiguang Green Energy provided integrated distributed solutions for Chaowei Power, including BIPV carports (Zhiyuan series), BIPV Zhiguang Tiles and BAPV, extending roof service life and supplying stable green power.
It is estimated that over its 25-year operation period, the project will generate a total of 339.1 million kWh of electricity, reduce 338,143 tons of carbon dioxide emissions and save 122,098 tons of standard coal, bringing significant economic benefits and contributing to Chaowei Power’s green development.
Close collaboration between Zhiguang Green Energy (backed by rich engineering experience) and Chaowei Power ensured on-time and high-quality project delivery throughout the whole process.
After this success, Zhiguang Green Energy will continue to deepen its presence in the new energy sector, enhance technical strength and service level, and cooperate with industrial chain partners to promote the healthy development of the new energy industry.

Facebook
Twitter
Email
Print

Get a Quote